Cherreads

Chapter 316 - Chapter 243: The Second Blood Calamity Disaster Plant

August 24, 2069, daytime.

Somewhere in the Western Pacific.

Phoenix Society Sky City - Phoenix City.

[August 24, 2069] [Saturday] [15:29:15 (CCST)]

System Log

Power System: Star Engine No. 1 is operating normally, with stable parameters and no malfunction alarms. The "Night Star 9" Sky City Nuclear Turbine Processor temperature is normal, entering maintenance phase 2-1 for the day.

Navigation System: In the first stage of cruising per the plan, flown [625] kilometers, speed at [210] kilometers/hour, altitude maintained at [9600] kilometers.

Airspace Radar: Coordinates XX-YY-ZZ+10 (offset from current position), tracking biological entity No. 04, sudden abnormal weather.

Abnormal Weather Description:

This is the end of Part One, download Chereads app to continue:
More Chapters